This study evaluated the feasibility of establishing rapid transit service between the City of St. George, Hurricane City, and the new St. George Airport. The study was commissioned by the Dixie Metropolitan Planning Organization (Dixie MPO) to examine Bus Rapid Transit (BRT) – a rubber-tired transit system similar to light rail, but with greater operating flexibility and potentially lower costs.
To view that study please use THIS LINK (Note: this is a 1.98MB PDF file that requires a PDF viewer)